Mezzanine floor installation in Hampshire
Mezzanine floor installation across Hampshire: free survey, structural design, Building Regulations approval and a fixed written quote. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Hampshire businesses
Many Basingstoke businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Distribution sheds around Eastleigh often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.
Typical work we price in Hampshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, port-side storage mezzanines. Hampshire is in the South East, around 107 miles from our Birmingham base on average.
What the job includes
- General arrangement drawing and structural calculations
- 38mm high-density chipboard, steel grating or chequer plate deck
- Survey of clear height, slab, access and escape routes
- Staircase, 1100mm handrails, kick plates and pallet gates
Towns we cover in Hampshire
- Southampton SO · 116 mi
- Portsmouth PO · 125 mi
- Basingstoke RG · 96 mi
- Winchester SO · 106 mi
- Farnborough GU · 100 mi
- Andover SP · 95 mi
- Eastleigh SO · 112 mi
Questions people ask
Do you cover all of Hampshire?
Yes. We provide mezzanine floor installation across Hampshire, including Southampton, Portsmouth, Basingstoke, Winchester, Farnborough and Andover, and nearby areas such as Berkshire, West Sussex and Wiltshire.
How quickly can you build a mezzanine office in Basingstoke?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Hampshire