Mezzanine Floors UK

Mezzanine floor installation in Wiltshire

Looking for mezzanine floor installation in Wiltshire? We survey, design and install across the county, including Swindon, Salisbury and Chippenham. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Steel mezzanine floor with staircase, handrails and pallet gate inside a warehouse (illustrative)

Mezzanine floor installation for Wiltshire businesses

Around Swindon, most mezzanine enquiries come from warehouses and distribution units: shelving floors for picking, packing areas below, and mezzanine offices overlooking the operation. We plan the build so despatch keeps running. In the factories and engineering works around Swindon, mezzanines often carry parts stores, tooling and offices above the line, and plant platforms give safe access for maintenance.

Typical work we price in Wiltshire includes storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines, mezzanine offices in industrial units. Wiltshire is in the South West, around 83 miles from our Birmingham base on average.

What the job includes

  • 38mm high-density chipboard, steel grating or chequer plate deck
  • Installation in phases around your operation
  • Steel frame designed to your floor load in kN/m²
  • Staircase, 1100mm handrails, kick plates and pallet gates

Towns we cover in Wiltshire

Questions people ask

Do you cover all of Wiltshire?

Yes. We provide mezzanine floor installation across Wiltshire, including Swindon, Salisbury and Chippenham, and nearby areas such as Bristol, Hampshire and Gloucestershire.

Can you install a warehouse mezzanine near Chippenham without stopping despatch?

Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.

How long does it take to install a mezzanine floor?

Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.

Do I need Building Regulations approval for a mezzanine?

Yes. A mezzanine is new structure and adds floor area, so it needs Building Regulations approval covering structure, fire safety, stairs and guarding. We prepare the drawings and calculations and manage the application.

Quote for mezzanine floor installation in Wiltshire

Free survey and a fixed written quote. We reply the same working day.

Send us the floor size. We'll price the mezzanine.

Free survey, structural design, Building Regulations approval and a fixed written quote.

CallWhatsAppGuide price