Mezzanine offices in Hampshire
We provide mezzanine offices throughout Hampshire, from Southampton to Eastleigh, for warehouses, factories, shops and industrial units. A mezzanine office puts staff accommodation on a steel mezzanine inside your industrial building, with partitions, ceilings, lighting, heating and fire protection fitted to the structure.

Mezzanine offices for Hampshire businesses
Many Southampton businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Distribution sheds around Eastleigh often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.
Typical work we price in Hampshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, port-side storage mezzanines. Hampshire is in the South East, around 107 miles from our Birmingham base on average.
What the job includes
- Glazed and solid partitions, doors and ironmongery
- Fire-rated ceiling, column casings and fascia to Building Control
- Structure designed for office loads including partitions
- Staircase designed as an escape route
Towns we cover in Hampshire
- Southampton SO · 116 mi
- Portsmouth PO · 125 mi
- Basingstoke RG · 96 mi
- Winchester SO · 106 mi
- Farnborough GU · 100 mi
- Andover SP · 95 mi
- Eastleigh SO · 112 mi
Questions people ask
Do you cover all of Hampshire?
Yes. We provide mezzanine offices across Hampshire, including Southampton, Portsmouth, Basingstoke, Winchester, Farnborough and Andover, and nearby areas such as Berkshire, West Sussex and Wiltshire.
How quickly can you build a mezzanine office in Winchester?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
Can you fit out the office as well?
Yes. We can hand over a shell or a finished office with partitions, glazing, ceilings, lighting and power, coordinated with your own M&E contractor if you have one.
How long does a mezzanine office take?
Structure and fire protection usually take one to two weeks on site after fabrication; partitions, ceilings and services typically add two to four weeks depending on size.
Nearby and related
Full guide to mezzanine offices · All mezzanine services in Hampshire
