Mezzanine Floors UK

Mezzanine offices in Hampshire

We provide mezzanine offices throughout Hampshire, from Southampton to Eastleigh, for warehouses, factories, shops and industrial units. A mezzanine office puts staff accommodation on a steel mezzanine inside your industrial building, with partitions, ceilings, lighting, heating and fire protection fitted to the structure.

Two-storey mezzanine office with glazed partitions and staircase inside an industrial unit (illustrative)

Mezzanine offices for Hampshire businesses

Many Southampton businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Distribution sheds around Eastleigh often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.

Typical work we price in Hampshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, port-side storage mezzanines. Hampshire is in the South East, around 107 miles from our Birmingham base on average.

What the job includes

  • Glazed and solid partitions, doors and ironmongery
  • Fire-rated ceiling, column casings and fascia to Building Control
  • Structure designed for office loads including partitions
  • Staircase designed as an escape route

Towns we cover in Hampshire

Questions people ask

Do you cover all of Hampshire?

Yes. We provide mezzanine offices across Hampshire, including Southampton, Portsmouth, Basingstoke, Winchester, Farnborough and Andover, and nearby areas such as Berkshire, West Sussex and Wiltshire.

How quickly can you build a mezzanine office in Winchester?

After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.

Can you fit out the office as well?

Yes. We can hand over a shell or a finished office with partitions, glazing, ceilings, lighting and power, coordinated with your own M&E contractor if you have one.

How long does a mezzanine office take?

Structure and fire protection usually take one to two weeks on site after fabrication; partitions, ceilings and services typically add two to four weeks depending on size.

Quote for mezzanine offices in Hampshire

Free survey and a fixed written quote. We reply the same working day.

Send us the floor size. We'll price the mezzanine.

Free survey, structural design, Building Regulations approval and a fixed written quote.

CallWhatsAppGuide price