Mezzanine floor installation in Berkshire
Our teams carry out mezzanine floor installation in Reading, Slough, Bracknell and Newbury and the rest of Berkshire. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Berkshire businesses
Many Newbury businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Around Slough, most mezzanine enquiries come from warehouses and distribution units: shelving floors for picking, packing areas below, and mezzanine offices overlooking the operation. We plan the build so despatch keeps running.
Typical work we price in Berkshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, workshop and storage mezzanines. Berkshire is in the South East, around 88 miles from our Birmingham base on average.
What the job includes
- Staircase, 1100mm handrails, kick plates and pallet gates
- Steel frame designed to your floor load in kN/m²
- Fire protection where Building Control requires it
- Survey of clear height, slab, access and escape routes
Questions people ask
Do you cover all of Berkshire?
Yes. We provide mezzanine floor installation across Berkshire, including Reading, Slough, Bracknell and Newbury, and nearby areas such as Surrey, Buckinghamshire and Hampshire.
How quickly can you build a mezzanine office in Bracknell?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
How much height do I need for a mezzanine floor?
As a rule of thumb, around 5m clear to the underside of the roof steel gives two usable levels, with about 2.4m or more under the deck. Lower buildings can still take a storage mezzanine with reduced headroom on top.