Mezzanine floor installation in Cambridgeshire

Looking for mezzanine floor installation in Cambridgeshire? We survey, design and install across the county, including Cambridge, Peterborough and Huntingdon. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Steel mezzanine floor with staircase, handrails and pallet gate inside a warehouse (illustrative)

Mezzanine floor installation for Cambridgeshire businesses

Many Peterborough businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Distribution sheds around Peterborough often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.

Typical work we price in Cambridgeshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines. Cambridgeshire is in the East of England, around 78 miles from our Birmingham base on average.

What the job includes

  • Installation in phases around your operation
  • Fire protection where Building Control requires it
  • 38mm high-density chipboard, steel grating or chequer plate deck
  • Building Regulations submission and sign-off

Towns we cover in Cambridgeshire

Questions people ask

Do you cover all of Cambridgeshire?

Yes. We provide mezzanine floor installation across Cambridgeshire, including Cambridge, Peterborough and Huntingdon, and nearby areas such as Northamptonshire, Bedfordshire and Rutland.

How quickly can you build a mezzanine office in Cambridge?

After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.

Do I need Building Regulations approval for a mezzanine?

Yes. A mezzanine is new structure and adds floor area, so it needs Building Regulations approval covering structure, fire safety, stairs and guarding. We prepare the drawings and calculations and manage the application.

How long does it take to install a mezzanine floor?

Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.

Quote for mezzanine floor installation in Cambridgeshire

Free survey and a fixed written quote. We reply the same working day.

Send us the floor size. We'll price the mezzanine.

Free survey, structural design, Building Regulations approval and a fixed written quote.

CallWhatsAppGuide price