Mezzanine floor installation in Bedfordshire
Our teams carry out mezzanine floor installation in Luton, Bedford and Dunstable and the rest of Bedfordshire. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Bedfordshire businesses
Around Dunstable, most mezzanine enquiries come from warehouses and distribution units: shelving floors for picking, packing areas below, and mezzanine offices overlooking the operation. We plan the build so despatch keeps running. Many Luton businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor.
Typical work we price in Bedfordshire includes storage and picking mezzanines in distribution units, mezzanine offices in industrial units, plant platforms and production-floor mezzanines. Bedfordshire is in the East of England, around 74 miles from our Birmingham base on average.
What the job includes
- Fire protection where Building Control requires it
- Staircase, 1100mm handrails, kick plates and pallet gates
- General arrangement drawing and structural calculations
- Survey of clear height, slab, access and escape routes
Questions people ask
Do you cover all of Bedfordshire?
Yes. We provide mezzanine floor installation across Bedfordshire, including Luton, Bedford and Dunstable, and nearby areas such as Hertfordshire, Buckinghamshire and Northamptonshire.
Can you install a warehouse mezzanine near Dunstable without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
Do I need Building Regulations approval for a mezzanine?
Yes. A mezzanine is new structure and adds floor area, so it needs Building Regulations approval covering structure, fire safety, stairs and guarding. We prepare the drawings and calculations and manage the application.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.