Mezzanine floor installation in Hertfordshire
Our teams carry out mezzanine floor installation in Watford, St Albans, Stevenage and Hemel Hempstead and the rest of Hertfordshire. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Hertfordshire businesses
Many Watford businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor. Around Hemel Hempstead, most mezzanine enquiries come from warehouses and distribution units: shelving floors for picking, packing areas below, and mezzanine offices overlooking the operation. We plan the build so despatch keeps running.
Typical work we price in Hertfordshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, first mezzanines in post-war industrial units. Hertfordshire is in the East of England, around 87 miles from our Birmingham base on average.
What the job includes
- Fire protection where Building Control requires it
- Installation in phases around your operation
- Building Regulations submission and sign-off
- General arrangement drawing and structural calculations
Towns we cover in Hertfordshire
- Watford WD · 90 mi
- St Albans AL · 87 mi
- Stevenage SG · 86 mi
- Hemel Hempstead HP · 83 mi
- Hatfield AL · 90 mi
Questions people ask
Do you cover all of Hertfordshire?
Yes. We provide mezzanine floor installation across Hertfordshire, including Watford, St Albans, Stevenage, Hemel Hempstead and Hatfield, and nearby areas such as Bedfordshire, Greater London and Buckinghamshire.
How quickly can you build a mezzanine office in Watford?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Hertfordshire
