Mezzanine floors in Cambridgeshire
Across Cambridgeshire we build new mezzanines, mezzanine offices and platforms, and alter, inspect or move existing ones, covering Cambridge, Peterborough and Huntingdon. Cambridgeshire is about 78 miles from our Birmingham base, in the East of England.
Mezzanine work in Cambridgeshire
Business parks and industrial estates around Huntingdon see steady demand for mezzanine offices: staff space and meeting rooms built inside the unit rather than in an extension. Distribution sheds around Peterborough often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. Manufacturers around Peterborough use mezzanines to lift offices, stores and welfare off the production floor, and steel platforms to reach machines safely. Work is usually planned into a shutdown.
Mezzanine services in Cambridgeshire
Towns in Cambridgeshire
- Cambridge CB · about 89 miles
- Peterborough PE · about 70 miles
- Huntingdon PE · about 75 miles
All mezzanine services
Mezzanine floor installationDesign, approval and fitting in oneFrom £110 per m²
Warehouse mezzanine floorsDouble the floor area of your shedFrom £100 per m²
Mezzanine officesOffices on the warehouse floorFrom £200 per m²
Pallet gates, handrails and balustradesEdge protection that stays closedFrom £950 per pallet gate
Mezzanine fire protectionFire-rated ceilings, casings and fasciasFrom £45 per m² of protected mezzanine
Mezzanine relocation and reconfigurationMove, resize or reuse a mezzanineFrom £45 per m² to dismantleQuestions people ask
Which towns in Cambridgeshire do you cover?
We cover the whole county, including Cambridge, Peterborough and Huntingdon.
How quickly can you survey in Cambridgeshire?
We book Cambridgeshire surveys alongside other work in the East of England. Send your postcode and preferred dates and we'll confirm a slot.
How quickly can you build a mezzanine office in Cambridgeshire?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
