Mezzanine Floors UK

Mezzanine offices in Berkshire

Looking for mezzanine offices in Berkshire? We survey, design and install across the county, including Reading, Slough, Bracknell and Newbury. A mezzanine office puts staff accommodation on a steel mezzanine inside your industrial building, with partitions, ceilings, lighting, heating and fire protection fitted to the structure.

Two-storey mezzanine office with glazed partitions and staircase inside an industrial unit (illustrative)

Mezzanine offices for Berkshire businesses

Business parks and industrial estates around Reading see steady demand for mezzanine offices: staff space and meeting rooms built inside the unit rather than in an extension. Distribution sheds around Slough often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.

Typical work we price in Berkshire includes mezzanine offices in industrial units, storage and picking mezzanines in distribution units, workshop and storage mezzanines. Berkshire is in the South East, around 88 miles from our Birmingham base on average.

What the job includes

  • Glazed and solid partitions, doors and ironmongery
  • Structure designed for office loads including partitions
  • Suspended ceilings with LED panels
  • Staircase designed as an escape route

Towns we cover in Berkshire

Questions people ask

Do you cover all of Berkshire?

Yes. We provide mezzanine offices across Berkshire, including Reading, Slough, Bracknell and Newbury, and nearby areas such as Surrey, Buckinghamshire and Hampshire.

How quickly can you build a mezzanine office in Reading?

After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.

Does a mezzanine office need fire protection?

Almost always. Where people work on or under a mezzanine, Building Control normally requires the steel and deck to be fire protected and the escape route to meet travel-distance limits. We design it in from the start.

How long does a mezzanine office take?

Structure and fire protection usually take one to two weeks on site after fabrication; partitions, ceilings and services typically add two to four weeks depending on size.

Quote for mezzanine offices in Berkshire

Free survey and a fixed written quote. We reply the same working day.

Send us the floor size. We'll price the mezzanine.

Free survey, structural design, Building Regulations approval and a fixed written quote.

CallWhatsAppGuide price