Mezzanine offices in Bedfordshire
Our teams carry out mezzanine offices in Luton, Bedford and Dunstable and the rest of Bedfordshire. A mezzanine office puts staff accommodation on a steel mezzanine inside your industrial building, with partitions, ceilings, lighting, heating and fire protection fitted to the structure.

Mezzanine offices for Bedfordshire businesses
Distribution sheds around Dunstable often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. Business parks and industrial estates around Bedford see steady demand for mezzanine offices: staff space and meeting rooms built inside the unit rather than in an extension.
Typical work we price in Bedfordshire includes storage and picking mezzanines in distribution units, mezzanine offices in industrial units, plant platforms and production-floor mezzanines. Bedfordshire is in the East of England, around 74 miles from our Birmingham base on average.
What the job includes
- Glazed and solid partitions, doors and ironmongery
- Fire-rated ceiling, column casings and fascia to Building Control
- Staircase designed as an escape route
- Suspended ceilings with LED panels
Questions people ask
Do you cover all of Bedfordshire?
Yes. We provide mezzanine offices across Bedfordshire, including Luton, Bedford and Dunstable, and nearby areas such as Hertfordshire, Buckinghamshire and Northamptonshire.
Can you install a warehouse mezzanine near Luton without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
Is planning permission needed for a mezzanine office?
Usually not, because it is internal work, but Building Regulations approval is required. Check your lease, and the council if the building is listed or the change alters how the building is used.
How long does a mezzanine office take?
Structure and fire protection usually take one to two weeks on site after fabrication; partitions, ceilings and services typically add two to four weeks depending on size.
Nearby and related
Full guide to mezzanine offices · All mezzanine services in Bedfordshire
