Mezzanine floor installation in Edinburgh and Lothians
Mezzanine floor installation across Edinburgh and Lothians: free survey, structural design, Building Regulations approval and a fixed written quote. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Edinburgh and Lothians businesses
Around Edinburgh, most mezzanine enquiries come from warehouses and distribution units: shelving floors for picking, packing areas below, and mezzanine offices overlooking the operation. We plan the build so despatch keeps running. In the factories and engineering works around Livingston, mezzanines often carry parts stores, tooling and offices above the line, and plant platforms give safe access for maintenance.
Typical work we price in Edinburgh and Lothians includes storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines, mezzanine offices in industrial units. Edinburgh and Lothians is in Scotland, around 240 miles from our Birmingham base on average.
What the job includes
- Staircase, 1100mm handrails, kick plates and pallet gates
- Building Regulations submission and sign-off
- Survey of clear height, slab, access and escape routes
- 38mm high-density chipboard, steel grating or chequer plate deck
Towns we cover in Edinburgh and Lothians
- Edinburgh EH · 240 mi
- Livingston EH · 239 mi
Questions people ask
Do you cover all of Edinburgh and Lothians?
Yes. We provide mezzanine floor installation across Edinburgh and Lothians, including Edinburgh and Livingston, and nearby areas such as Central Scotland and Tayside, Glasgow and West Scotland and Northumberland.
Can you install a warehouse mezzanine near Edinburgh without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Edinburgh and Lothians
