Mezzanine floor installation in Northumberland
Our teams carry out mezzanine floor installation in Cramlington and Morpeth and the rest of Northumberland. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Northumberland businesses
Distribution sheds around Cramlington often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. Manufacturers around Cramlington use mezzanines to lift offices, stores and welfare off the production floor, and steel platforms to reach machines safely. Work is usually planned into a shutdown.
Typical work we price in Northumberland includes storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines, mezzanines in older industrial buildings. Northumberland is in the North East, around 178 miles from our Birmingham base on average.
What the job includes
- General arrangement drawing and structural calculations
- Building Regulations submission and sign-off
- Steel frame designed to your floor load in kN/m²
- Installation in phases around your operation
Towns we cover in Northumberland
- Cramlington NE · 175 mi
- Morpeth NE · 181 mi
Questions people ask
Do you cover all of Northumberland?
Yes. We provide mezzanine floor installation across Northumberland, including Cramlington and Morpeth, and nearby areas such as Tyne and Wear, County Durham and Cumbria.
Can you install a warehouse mezzanine near Cramlington without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
How much height do I need for a mezzanine floor?
As a rule of thumb, around 5m clear to the underside of the roof steel gives two usable levels, with about 2.4m or more under the deck. Lower buildings can still take a storage mezzanine with reduced headroom on top.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.