Mezzanine floor installation in Tyne and Wear
Looking for mezzanine floor installation in Tyne and Wear? We survey, design and install across the county, including Newcastle upon Tyne, Sunderland, Gateshead and Washington. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Tyne and Wear businesses
Distribution sheds around Washington often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. Manufacturers around Washington use mezzanines to lift offices, stores and welfare off the production floor, and steel platforms to reach machines safely. Work is usually planned into a shutdown.
Typical work we price in Tyne and Wear includes storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines, stockroom and sales-floor mezzanines. Tyne and Wear is in the North East, around 165 miles from our Birmingham base on average.
What the job includes
- General arrangement drawing and structural calculations
- 38mm high-density chipboard, steel grating or chequer plate deck
- Steel frame designed to your floor load in kN/m²
- Staircase, 1100mm handrails, kick plates and pallet gates
Towns we cover in Tyne and Wear
- Newcastle upon Tyne NE · 168 mi
- Sunderland SR · 164 mi
- Gateshead NE · 166 mi
- Washington NE · 163 mi
Questions people ask
Do you cover all of Tyne and Wear?
Yes. We provide mezzanine floor installation across Tyne and Wear, including Newcastle upon Tyne, Sunderland, Gateshead and Washington, and nearby areas such as Northumberland, County Durham and Cumbria.
Can you install a warehouse mezzanine near Washington without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Tyne and Wear
