Mezzanine floor installation in Kent
Our teams carry out mezzanine floor installation in Maidstone, Canterbury, Ashford and Dartford and the rest of Kent. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Kent businesses
Distribution sheds around Dartford often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. Many Tunbridge Wells businesses with an industrial unit want their office next to the operation. A fire-protected mezzanine office does that in weeks, with glazing looking over the floor.
Typical work we price in Kent includes storage and picking mezzanines in distribution units, mezzanine offices in industrial units, stockroom and sales-floor mezzanines. Kent is in the South East, around 143 miles from our Birmingham base on average.
What the job includes
- Steel frame designed to your floor load in kN/m²
- Fire protection where Building Control requires it
- Staircase, 1100mm handrails, kick plates and pallet gates
- Building Regulations submission and sign-off
Towns we cover in Kent
- Maidstone ME · 137 mi
- Canterbury CT · 155 mi
- Ashford TN · 154 mi
- Dartford DA · 119 mi
- Tunbridge Wells TN · 135 mi
- Dover CT · 170 mi
- Sittingbourne ME · 141 mi
- Aylesford ME · 134 mi
Questions people ask
Do you cover all of Kent?
Yes. We provide mezzanine floor installation across Kent, including Maidstone, Canterbury, Ashford, Dartford, Tunbridge Wells and Dover, and nearby areas such as Essex, East Sussex and Greater London.
Can you install a warehouse mezzanine near Ashford without stopping despatch?
Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.
Can a mezzanine be moved later?
Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Kent
