Industrial and plant platforms in Greater London
We provide industrial and plant platforms throughout Greater London, from City of London to Hayes, for warehouses, factories, shops and industrial units. Industrial and plant platforms are steel platforms built around machinery, process lines, tanks or rooftop plant so people can operate, inspect and maintain them safely at height.

Industrial and plant platforms for Greater London businesses
Business parks and industrial estates around Bromley see steady demand for mezzanine offices: staff space and meeting rooms built inside the unit rather than in an extension. Retail units and trade counters in Wembley add mezzanines for stockrooms, staff space or extra sales floor. Where customers go upstairs we design for public use, and in England we check the 200 m² planning rule early.
Typical work we price in Greater London includes mezzanine offices in industrial units, stockroom and sales-floor mezzanines, storage and picking mezzanines in distribution units. Greater London is in London, around 104 miles from our Birmingham base on average.
What the job includes
- Designed for point loads from equipment
- Galvanised grating or chequer plate decks
- Prefabricated for shutdown installation
- Survey and design around the machine and maintenance points
Towns we cover in Greater London
- City of London EC · 106 mi
- Westminster SW · 105 mi
- Canary Wharf E · 109 mi
- Stratford E · 107 mi
- Croydon CR · 113 mi
- Hammersmith W · 103 mi
- Ealing W · 99 mi
- Kingston upon Thames KT · 105 mi
- Wembley HA · 98 mi
- Enfield EN · 100 mi
- Bromley BR · 114 mi
- Hayes UB · 96 mi
Questions people ask
Do you cover all of Greater London?
Yes. We provide industrial and plant platforms across Greater London, including City of London, Westminster, Canary Wharf, Stratford, Croydon and Hammersmith, and nearby areas such as Surrey, Hertfordshire and Essex.
How quickly can you build a mezzanine office in City of London?
After design and approval, the steel and fire protection usually take one to two weeks on site, and partitions, ceilings and services two to four more depending on size.
Do plant platforms need Building Regulations approval?
It depends on the platform and how it is used. Access platforms for maintenance are often treated differently from occupied floors. We confirm the position with Building Control on each job.
Grating or chequer plate for a plant platform?
Open grating is the usual choice: it is light, lets dust and water through and does not get slippery. Chequer plate suits areas where small parts or tools must not drop through.
Nearby and related
Full guide to industrial and plant platforms · All mezzanine services in Greater London
