Mezzanine Floors UK

Mezzanine floor installation in Merseyside

Mezzanine floor installation across Merseyside: free survey, structural design, Building Regulations approval and a fixed written quote. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Steel mezzanine floor with staircase, handrails and pallet gate inside a warehouse (illustrative)

Mezzanine floor installation for Merseyside businesses

Distribution sheds around Knowsley often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work. In the factories and engineering works around Knowsley, mezzanines often carry parts stores, tooling and offices above the line, and plant platforms give safe access for maintenance.

Typical work we price in Merseyside includes storage and picking mezzanines in distribution units, plant platforms and production-floor mezzanines, port-side storage mezzanines. Merseyside is in the North West, around 73 miles from our Birmingham base on average.

What the job includes

  • Installation in phases around your operation
  • General arrangement drawing and structural calculations
  • 38mm high-density chipboard, steel grating or chequer plate deck
  • Staircase, 1100mm handrails, kick plates and pallet gates

Towns we cover in Merseyside

Questions people ask

Do you cover all of Merseyside?

Yes. We provide mezzanine floor installation across Merseyside, including Liverpool, St Helens, Birkenhead and Knowsley, and nearby areas such as Cheshire, Greater Manchester and Lancashire.

Can you install a warehouse mezzanine near Knowsley without stopping despatch?

Yes. We fence off the work zone, deliver steel at agreed times, and phase the build so picking and despatch keep running.

How long does it take to install a mezzanine floor?

Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.

Can a mezzanine be moved later?

Yes. Bolted steel mezzanines can be dismantled, altered and re-erected. The design and Building Regulations approval need checking again for the new building.

Quote for mezzanine floor installation in Merseyside

Free survey and a fixed written quote. We reply the same working day.

Send us the floor size. We'll price the mezzanine.

Free survey, structural design, Building Regulations approval and a fixed written quote.

CallWhatsAppGuide price