Mezzanine floor installation in Lincolnshire
Looking for mezzanine floor installation in Lincolnshire? We survey, design and install across the county, including Lincoln, Grantham, Boston and Spalding. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Lincolnshire businesses
In the factories and engineering works around Grimsby, mezzanines often carry parts stores, tooling and offices above the line, and plant platforms give safe access for maintenance. Distribution sheds around Spalding often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.
Typical work we price in Lincolnshire includes plant platforms and production-floor mezzanines, storage and picking mezzanines in distribution units, stockroom and sales-floor mezzanines. Lincolnshire is in the East Midlands, around 78 miles from our Birmingham base on average.
What the job includes
- 38mm high-density chipboard, steel grating or chequer plate deck
- General arrangement drawing and structural calculations
- Building Regulations submission and sign-off
- Fire protection where Building Control requires it
Questions people ask
Do you cover all of Lincolnshire?
Yes. We provide mezzanine floor installation across Lincolnshire, including Lincoln, Grantham, Boston, Spalding, Grimsby and Scunthorpe, and nearby areas such as Nottinghamshire, Rutland and East Riding of Yorkshire.
Can a plant platform near Spalding go in during our shutdown?
Yes. We prefabricate the steel and plan the installation for your shutdown window so the line restarts on time.
Do I need Building Regulations approval for a mezzanine?
Yes. A mezzanine is new structure and adds floor area, so it needs Building Regulations approval covering structure, fire safety, stairs and guarding. We prepare the drawings and calculations and manage the application.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Lincolnshire
