Mezzanine floor installation in Derbyshire
We provide mezzanine floor installation throughout Derbyshire, from Derby to Swadlincote, for warehouses, factories, shops and industrial units. A mezzanine floor is a free-standing steel platform built inside an existing building to add a second level of usable floor space, usually for storage, offices or production.

Mezzanine floor installation for Derbyshire businesses
Manufacturers around Chesterfield use mezzanines to lift offices, stores and welfare off the production floor, and steel platforms to reach machines safely. Work is usually planned into a shutdown. Distribution sheds around Derby often run out of floor before they run out of height. A storage mezzanine over packing, returns or small-parts picking can add hundreds of square metres without a move, with pallet gates placed where forklifts already work.
Typical work we price in Derbyshire includes plant platforms and production-floor mezzanines, storage and picking mezzanines in distribution units, mezzanine offices in industrial units. Derbyshire is in the East Midlands, around 34 miles from our Birmingham base on average.
What the job includes
- Installation in phases around your operation
- Steel frame designed to your floor load in kN/m²
- Survey of clear height, slab, access and escape routes
- Fire protection where Building Control requires it
Towns we cover in Derbyshire
- Derby DE · 31 mi
- Chesterfield S · 51 mi
- Swadlincote DE · 21 mi
Questions people ask
Do you cover all of Derbyshire?
Yes. We provide mezzanine floor installation across Derbyshire, including Derby, Chesterfield and Swadlincote, and nearby areas such as Nottinghamshire, Staffordshire and Leicestershire.
Can a plant platform near Derby go in during our shutdown?
Yes. We prefabricate the steel and plan the installation for your shutdown window so the line restarts on time.
Do I need Building Regulations approval for a mezzanine?
Yes. A mezzanine is new structure and adds floor area, so it needs Building Regulations approval covering structure, fire safety, stairs and guarding. We prepare the drawings and calculations and manage the application.
How long does it take to install a mezzanine floor?
Design and Building Control usually take one to three weeks and steel fabrication three to six weeks. On site, a 100–300 m² storage mezzanine typically goes up in two to five working days; large or fire-protected floors take longer.
Nearby and related
Full guide to mezzanine floor installation · All mezzanine services in Derbyshire
